You have been redirected to your local version of the requested page

Water of the primary cycle of pressurized water reactors (PWR) contains boron for neutron absorption. The high borate content interferes with the direct analysis of trace anions. Inline Neutralization combined with variable preconcentration and Inline Matrix Elimination (MiPCT-ME) allows to remove boron as boric acid before injection.

Contact

Metrohm AG

Ionenstrasse
9100 Herisau

Contact